News travel energy

Electric vehicle chargepoint grants: what’s changing from 1 April 2026?

Contributor

Climate Connections


Date

27 March 2026


If you’re thinking about installing an electric vehicle (EV) chargepoint at home or at your work, there are some important changes coming to government grants. These updates affect who can apply, how much funding is available and which schemes are closing.

Here’s a simple overview to help you stay up to date.

Grants closing on 31 March 2026

Three existing schemes will come to an end. After this date, no new applications will be accepted for:

New and updated grants from 1 April 2026

Most of the remaining grants will continue for one more year, until 31 March 2027, with updated funding levels.

For homes

The following schemes will stay open, with funding available until March 2027:

What’s changing?

  • The maximum grant will increase from £350 to £500 per socket for applications made from 1 April.
  • A new “Find a grant” service will replace the current application portal.
  • Applicants will need to create an account and apply directly through the new system.

If you applied before 1 April, you can re‑apply using the new service to access the higher £500 rate (only if your chargepoint has not yet been installed),

For workplaces

The Workplace Charging Scheme (WCS) will continue, with funding available until March 2027.

What’s changing?

  • The maximum grant will increase from £350 to £500 per socket for installations completed from 1 April. This applies even if you applied before that date.

For state‑funded education institutions

The WCS for education settings will remain open until March 2027.

What’s changing?

  • The maximum grant will decrease from £2,500 to £2,000 per socket for applications made from 1 April.
  • Applications made before 1 April will still receive £2,500 per socket if vouchers are used by 30 September 2026.

Where to find out more

Full details about these changes are available on the GOV.UK website.

More
News

Image shows large conference room with presentations and large audience
buildings energy

Plymouth heat network attracts investor attention

More than 50 heat network development partners, investors and local suppliers attend heat network bidders event.

travel

Beat the January Blues with Beryl Bikes

Join Beryl Monday's campaign from 19 to 25 January and beat the January blues with a bike ride.